End of Project checklist

End of Project check list
Having put together all the O&M information from all the sub-contractors, there are several areas that need to be cross checked, especially for the inclusion in the H&S file.
- Are there any last minute sub-contractors that we might not have been told about
- Were there any direct purchases by the main contractor, that the sub-contractors might not have mentioned
- Is the main contractor aware of any residual hazards that might have been omitted by sub-contractors that we should include (example Residual hazards)
- Are there any load bearing calculations (or similar) we should be getting?
- Are there any end of project surveys eg drain surveys
- Who is the architect and will they be providing
- final As Built drawings or final construction drawings?
- Planning permission and building regulation documentation
- Do you know if the designers prepared any strategy documents that should be included in the H&S file eg Disabled access, fire strategy, cleaning strategy etc